|   Last update:  
    
      Apr  1, 2000
 | 
 | 
 
Gerry Abrams1, 
    Perry Anthony2, 
    Mario Bandioli3, 
    Chris Brown4, 
    Pierre-Alexandre Fischer5, 
    Fulvio Galeazzi6, 
    Kenneth Kang7, 
    David Kirkby7, 
    Steve Lewis1, 
    Carl Lionberger1, 
    Martin Kocian8, 
    Tim Meyer7, 
    Tom Meyer5, 
    Mauro Morandin9, 
    James Olsen10, 
    Pierluigi Paolucci11, 
    Christophe Thiebaux12, 
    Vincent Tisserand13, 
    George Vasileiadas12, 
    George Zioulas14
  |  | BaBar Online Detector Control |  
    Lawrence Berkeley LaboratoryStanford Linear Accelerator LaboratoryINFN Sezione di PisaUniversity of VictoriaIowa State UniversityINFN Sezione di PadovaStanford UniversityTechn. Univ. DresdenINFNUniversity of MarylandINFN Sezione di NapoliEcole PolytechniqueAnnecyStanford Linear Accelerator Center Speaker: 
James OlsenThe BaBar online detector control system uses the Engineering and Physics
Industrial Control System (EPICS) to control and monitor the detector
subsystems, environmental conditions, and accelerator parameters at the SLAC
PEP-II B-Factory.  We describe the EPICS hardware and software implementation,
interaction with the rest of the BaBar online system through Run_Control,
archiving of ambient data to the Objectivity database, and the handshaking
mechanism between PEP-II and BaBar used to coordinate the injection sequence.
Emphasis will be on operational experience over the May through September 
running period. 
 
| Presentation:   | Short Paper:   | 
 
 
 |